翻訳と辞書
Words near each other
・ Morecambe (play)
・ Morecambe and Heysham War Memorial
・ Morecambe and Lonsdale (UK Parliament constituency)
・ Morecambe and Lunesdale (UK Parliament constituency)
・ Morecambe and Lunesdale by-election, 1958
・ Morecambe and Wise
・ Morecambe Bay
・ Morecambe Bay Independents
・ Morecambe Bay Pavements
・ Morecambe Branch Line
・ Morecambe Church Lads' Brigade at Drill
・ Morecambe Cricket Club
・ Morecambe Euston Road railway station
・ Morecambe F.C.
・ Morecambe High School
Morecambe Promenade railway station
・ Morecambe railway station
・ Morecambe RFC
・ Morecambe Tramways
・ Morecambe Winter Gardens
・ Morecambe, Alberta
・ Moreda
・ Moreda de Álava
・ Moreda, Aller
・ Moredon Halt railway station
・ Moredun
・ Moredun Creek
・ Moredun Research Institute
・ Moree
・ Moree Airport


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Morecambe Promenade railway station : ウィキペディア英語版
Morecambe Promenade railway station

Morecambe Promenade Station was a railway station in Morecambe, Lancashire. It was opened on 24 March 1907 by the Midland Railway and closed in February 1994. After twelve weeks break in passenger service for the revision of track work and signalling a new Morecambe Station was opened on a site closer to the town centre.
It was named Morecambe Station both before and after being named ''Morecambe Promenade''.
== History ==
Built by the Midland Railway Company as the terminus of the former "little" North Western Railway, Morecambe Promenade Station first opened to passengers in 1907.〔(Gloucestershire Transport History )〕 It served as a replacement for the inadequate Northumberland Street Station (which was ironically situated on the site of the new two-platform Morecambe station).〔(The Railway Scene )〕
The Promenade station was built to cater for a large influx of passenger numbers. To this effect, the station comprised four main platforms and a goods siding.〔 When the station first opened, there was some controversy over the segregation of passengers into 1st and 2nd class waiting rooms. Many passengers disapproved of this and chose to wait instead in the station concourse.〔(Morecambe Bay archives )〕 The Midland Railway sought to exploit the potential of moving holidaymakers between Morecambe, Heysham and Lancaster and to provide a speedy and efficient service for workers at the then state-of-the-art 1905 port.〔(Lancaster UK Online )〕 The station was therefore constructed opposite the old Midland Hotel, enabling tourists arriving overnight by rail to stay in the hotel before taking the boat to the Isle of Man and Barrow from the Stone Jetty. Passengers using the facilities came from Leeds and Bradford as well as the West Coast of Scotland.〔(Lancaster City Council, "The Platform Celebrates its Centenary!", 7 March 2007 )〕
The Midland Railway also electrified the recently opened branch line from to Morecambe Promenade on 13 April 1908 and the main line to Lancaster soon afterwards.〔 Three new 3-car Electric Multiple Units were purpose built by the Midland at Derby to operate the service, which ran every 30 minutes throughout the day between the main LNWR station at Castle & Heysham with reversals en route here and at Lancaster Green Ayre. The new trains proved to be popular with the public and also very reliable (with an availability rate of over 99% in the first 15 months of operation).〔 These were maintained at the station, whilst the electrical power for the overhead lines was supplied from the company's power station at Heysham Harbour.
With a fast & frequent electric local service and also regular links to and from the West Riding of Yorkshire, it was no surprise that the station soon became very busy (especially in the summer months), handling significantly more traffic than the rival LNWR station at nearby . This tendency continued after World War I and the 1923 Grouping, when both lines into the resort came under the ownership of the London, Midland and Scottish Railway. Under LMS control, the station was officially named "Morecambe Promenade" from 2 June 1924 and also began to handle some services travelling to the town over the ex-LNWR branch line from Hest Bank once again, notably the daily Northern Irish boat train from London Euston to Heysham (inaugurated in 1928〔Binns, D (1982) ''The 'Little' North Western Railway'', Wyvern Publishing, Skipton. ISBN 0-907941-01-X, p.41〕) and various long distance summer excursions from stations such as Manchester Victoria, , and . The volume of summer traffic to the resort was such though (thanks to the LMS company's continued promotion of Morecambe as a holiday destination) that Promenade couldn't handle all the traffic on offer and many trains still had to use Euston Road.
Nationalisation of the UK railway network in 1948 saw British Railways take over control of the station and heralded an era of significant changes. The first of these came in February 1951, when the 3 EMU sets were all withdrawn (after more than 40 years of service) and scrapped. Steam push-pull sets initially replaced them, but in 1953 electric working was reinstated - still at 6600V AC and using the same infrastructure, but this time at a 50Hz frequency. Three replacement EMU sets built in 1914 & formerly used on the to Earls Court route in London were brought in to run the service, with a fourth added in 1957.〔 Another notable change occurred in September 1958, when the former LNWR terminus at Euston Road was closed to regular passenger traffic at the end of the summer timetable.〔(Disused Stations - Morecambe Euston Road ) ''Disused Stations''; Retrieved 2014-07-03〕 The local services from Lancaster & Carnforth via henceforth followed the same route as the Irish Boat trains into Promenade, leaving Euston Road to be served only during the peak summer season between June & September until 1962. Summer traffic was by this time slowly declining (due to the rise in private car ownership and increasing availability of foreign package holidays), but there was still sufficient numbers visiting the resort in 1959 to require more than 20 scheduled & excursion trains to & from Euston Road and a similar number from Promenade.
By 1963 though, all services had been permanently diverted to Promenade station and the future was looking increasingly uncertain following the publication of the Beeching Report. The report's author, Richard Beeching - the Chairman of the British Transport Commission, treated branch lines as irrelevant to the overall operation of intercity rail networks, believing that car owners would drive to and park at mainline stations before taking the train. One of the recommendations of his report was that service provision to the town needed to be "modified", with one of the two routes eastwards closed and the remaining traffic concentrated on the other. Initially this was expected to be the ex-Midland line, but in the spring of 1964, it was announced that the former LNWR branch would be the one to be kept, even though the ex-Midland route was electrified and more heavily used. As part of these plans, Promenade would be retained (at least in the short term) along with the branch to Heysham, but the former main line to Green Ayre and on to Wennington would be abandoned. The Leeds trains were to be re-routed via Carnforth and Hest Bank, whilst the existing DMU local service to Lancaster via Bare Lane would see an increase in frequency to compensate. As it transpired though, further proposals were put forward by BR the following year to build a new south to east curve at Torrisholme that would allow direct running from Bare Lane towards Heysham without the need for a reversal at Promenade. Had these been enacted, Promenade would have been closed and Euston Road re-opened as the terminus for the branch services from Lancaster & Leeds.〔 However, local opposition to the new curve (which would have required the demolition of property along its route) saw the scheme dropped and the original plans proceeded with.
Passenger services on the ex-Midland line through Green Ayre were duly withdrawn on and from 3 January 1966, along with most local trains to and from Heysham (though the boat trains from Manchester & London continued) and the overhead wires switched off. Thereafter only the DMU-worked local shuttle to Lancaster via Bare Lane served the station, along with the re-routed services to and from Leeds via Carnforth and the few remaining summer excursions. Goods traffic continued for a further year on the Midland route, but in June 1967 it was closed completely between Morecambe & Wennington and subsequently dismantled. The overhead wires were removed from the Heysham branch at the same time. Ironically, a mere seven years after dismantling took place, what is now known as the West Coast Main Line from through Lancaster Castle station and onwards to Glasgow was electrified.〔(New Railway Modellers )〕
Although Promenade station did eventually manage to survive the Beeching Axe, by the late 1980s tourism in Morecambe was rapidly declining.〔Morecambe〕 Traffic levels were significantly lower than they'd been at their peak 30+ years earlier, but the four platform, fully signalled layout had remained largely unaltered and was arguably far too large for the modest service (1-2 trains per hour) in operation by this time. The local authority was also keen to regenerate & redevelop the sea front area surrounding it and the adjacent Midland Hotel, so in 1993 the decision was taken to close Promenade Station and replace it with a new station situated slightly further inland and closer to the town centre. A final commemorative railtour visited the station the evening before its official closure on 7 February 1994.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Morecambe Promenade railway station」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.